Change Order (USA) Horse
About
Change Order is a 4yo b unknown from United States trained by Ilmar Loaiza, who is based at . It is sired by the stallion Vino Rosso out of the dam Impending Storm. Change Order has managed to win 1 race in its career so far. On 28th Nov 2024 at Tampa Bay Downs, Change Order scored its most significant win to date, getting the money in the $17001.00 Md.
Race Record
| Event Summary | Runner Stats | Rank |
|---|---|---|
| Finger Lakes 27-Nov-25 1210m R5 Race 5 $959 (of $13,700) Barrier 2, Winning Time: 01:13.210, SP: 34.00 | R J Rohena 56.2kg 5.75L | 4 (10) |
| Finger Lakes 04-Nov-25 1210m R4 Race 4 $137 (of $13,700) Barrier 4, Winning Time: 01:13.720, SP: 13.00 | C Navarro 56.2kg 5.30L | 7 (8) |
| Finger Lakes 22-Oct-25 1110m R9 Race 9 $137 (of $13,700) Barrier 8, Winning Time: 01:06.200, SP: 8.50 | K Coa 56.2kg 6.00L | 6 (9) |
| Finger Lakes 09-Oct-25 1210m R5 Race 5 $1,370 (of $13,700) Barrier 5, Winning Time: 01:14.210, SP: 4.33 | C Navarro 56.2kg 5.00L | 3 (9) |
| Finger Lakes 25-Sep-25 1110m R7 Race 7 $2,740 (of $13,700) Barrier 7, Winning Time: 01:06.470, SP: 6.50 | C Navarro 56.2kg 0.10L | 2 (7) |
| Finger Lakes 11-Sep-25 1210m R6 Race 6 $1,370 (of $13,700) Barrier 6, Winning Time: 01:15.470, SP: 4.50 | C Navarro 56.2kg 0.50L | 3 (9) |
| Finger Lakes 28-Aug-25 1210m R7 Race 7 $350 (of $17,500) Barrier 7, Winning Time: 01:12.370, SP: 34.00 | H Harkie 56.2kg 11.00L | 5 (9) |
| Finger Lakes 19-Aug-25 1110m R8 Race 8 $351 (of $17,500) Barrier 2, Winning Time: 01:07.020, SP: 17.00 | H Harkie 56.2kg 8.75L | 5 (7) |
| Finger Lakes 30-Jul-25 1210m FIRM R7 Race 7 $262 (of $17,500) Barrier 6, Winning Time: 01:13.720, SP: 15.00 | H Harkie 56.2kg 13.45L | 7 (7) |
| Finger Lakes 16-Jul-25 1110m FIRM R4 Race 4 $1,750 (of $17,500) Barrier 4, Winning Time: 01:06.800, SP: 21.00 Slmd foe st,rail bid | H Harkie 56.2kg 0.60L | 3 (8) |
| Finger Lakes 02-Jul-25 1610m GOOD R5 Race 5 (of $26,500) Barrier 9, Winning Time: 01:43.010, SP: 34.00 5w1/2,rail5/16,tired | A S Worrie 56.2kg 23.10L | 9 (9) |
| Finger Lakes 05-Jun-25 1110m FIRM R7 Race 7 $795 (of $26,500) Barrier 4, Winning Time: 01:06.210, SP: 26.00 4w3/8,2p1/4,no factor | A S Worrie 56.2kg 5.35L | 5 (5) |
| Finger Lakes 22-May-25 1110m FIRM R7 Race 7 $530 (of $26,500) Barrier 5, Winning Time: 01:07.960, SP: 21.00 6w1/2,5w trn,tired | C J Navarro 56.2kg 11.75L | 6 (6) |
| Finger Lakes 06-May-25 910m FIRM R4 Race 4 $1,855 (of $26,500) Barrier 3, Winning Time: 00:52.790, SP: 21.00 Rail trip,wth interest | C J Navarro 56.2kg 5.30L | 4 (5) |
| Tampa Bay Downs 17-Mar-25 1310m FIRM R8 Race 8 $197 (of $21,000) Barrier 1, Winning Time: 01:17.900, SP: 26.00 moved out off the rail in the early going racing at the back, was never near enough to threaten. | A Rodriguez 53.5kg 19.25L | 7 (7) |
| Tampa Bay Downs 01-Mar-25 1310m FIRM R3 Race 3 $200 (of $21,500) Barrier 4, Winning Time: 01:18.110, SP: 21.00 raced off the pace inside and was outrun. | A Rodriguez 53.5kg 10.25L | 7 (7) |
| Tampa Bay Downs 15-Feb-25 1410m FIRM R1 Race 1 $1,260 (of $18,000) Barrier 6, Winning Time: 01:24.380, SP: 3.50 tracked on the inside, chased inside on the turn and closed mildly in the two path. | M Iorio 53.5kg 4.75L | 4 (9) |
| Tampa Bay Downs 02-Feb-25 1210m FIRM R5 Race 5 $3,600 (of $18,000) Barrier 12, Winning Time: 01:11.610, SP: 5.50 was rated on the outside early, made a four wide move on the turn to be in contention by the quarter pole, made a bid leaving the turn and ran on to the wire but was outfinished by the winner in a good effort. | S Leon 53.5kg 0.75L | 2 (11) |
| Tampa Bay Downs 16-Jan-25 1410m FIRM R4 Race 4 $3,600 (of $18,000) Barrier 5, Winning Time: 01:25.140, SP: 5.50 2-3p,outkicked,2d best | A Rodriguez 54.4kg 0.50L | 2 (10) |
| Tampa Bay Downs 02-Jan-25 1410m FIRM R4 Race 4 (of $18,000) Barrier 7, Winning Time: 01:25.440, SP: 4.50 chased the pace, raced in the four path on the turn and weakened. | A Gonzalez 54.4kg 12.10L | 8 (8) |
| Tampa Bay Downs 14-Dec-24 1410m FIRM R8 Race 8 $1,800 (of $18,000) Barrier 12, Winning Time: 01:24.590, SP: 4.00 well placed and outside, looped to position three wide through the turn, bid on that path into the stretch, drifted in and lacked the needed late kick. | A Gonzalez 54.4kg 1.00L | 3 (11) |
| Tampa Bay Downs 28-Nov-24 1210m FIRM R1 Md $10,710 (of $17,001) Barrier 1, Winning Time: 01:10.790, SP: 17.00 set the pace just off the rail, stayed on when challenged into the stretch, shook clear, then lasted under steady pressure. | A Gonzalez 55.3kg | 1 (7) |
| Philadelphia Park 23-Oct-24 1310m FIRM Md (of $15,960), Winning Time: 01:20.840, SP: 6/1 Chased 3w turn, tired | L Rivera 55.3kg, Cd 0 0.15L | 4 (8) |
| Philadelphia Park 25-Sep-24 1210m FIRM Md (of $13,200), Winning Time: 01:12.680, SP: 18/1 Never in contention | J Torres 55.3kg, Cd 0 0.15L | 7 (8) |
| Colonial Downs 05-Sep-24 1610m GOOD R11 Md (of $27,999) Barrier 12, Winning Time: 01:36.910 tracked the pace from two wide in the second flight, rallied on the final turn to loom up and weakened in the stretch. | T Conner 53.5kg 6.60L | 6 (11) |
| Colonial Downs 25-Aug-24 1710m GOOD R2 Md (of $45,000) Barrier 3, Winning Time: 01:43.500 was not a factor. | I Villalobos 53.5kg 5.75L | 6 (7) |
| Colonial Downs 27-Jul-24 1610m GOOD R1 Md (of $35,000) Barrier 6, Winning Time: 01:39.570 in tight at the start, settled in mid pack, in some traffic into the far turn, came up empty for the stretch run. | R Silvera 53.5kg 7.50L | 7 (10) |
| Aqueduct 04-Dec-23 1310m FIRM R9 Md (of $36,000) Barrier 2, Winning Time: 01:19.670 was hustled from the gate, chased the pace, dropped back late on the backstretch, moved from the two path to the four path on the turn, floated six wide into the stretch and had nothing left. | R Silvera 54kg 8.35L | 7 (12) |
| Aqueduct 10-Nov-23 1210m FIRM R9 Md $2,520 (of $36,000) Barrier 10, Winning Time: 01:11.690 was away awkwardly, raced on the outside under urging, dropped back four wide on the turn and tired. | L R R Jr 54kg, Cd 56.2kg 15.75L | 4 (7) |
Similar Track Horses