Change Order (USA) Horse
Country
Foal Date
Colour
Sire
Dam
Prize Money
Trainer
Owners
About
Change Order, a 5yo bay foaled in the United States and trained by Ilmar Loaiza, is by Vino Rosso out of Impending Storm. The horse has recorded one victory, the most notable occurring on 28 Nov 2024 at Tampa Bay Downs, where it earned $17,001 in a $17,001 MD.
Race Record
| Event Summary | Runner Stats | Rank |
|---|---|---|
| Finger Lakes 27-Nov-25 1210m R5 Race 5 $959 (of $13,700) Barrier 2, Winning Time: 01:13.210, SP: 34.00 1st Unwoke ( J Flores 121 ) 2nd Honey In The Bank ( J C Berrios 121 ) 4.00L 3rd Esther's Salad ( L E Perez 121 ) 5.50L 4th Change Order ( R R Jr 124 ) 5.75L See full results | R R Jr 56.2kg 5.75L | 4 (10) |
| Finger Lakes 04-Nov-25 1210m R4 Race 4 $137 (of $13,700) Barrier 4, Winning Time: 01:13.720, SP: 13.00 1st Playing With Dolls ( L E Perez 124 ) 2nd Cue The Music ( O Gomez 121 ) 0.25L 3rd Moontown ( M A D Jr 121 ) 1.75L 7th Change Order ( C J Navarro 124 ) 5.30L See full results | C J Navarro 56.2kg 5.30L | 7 (8) |
| Finger Lakes 22-Oct-25 1110m R9 Race 9 $137 (of $13,700) Barrier 8, Winning Time: 01:06.200, SP: 8.50 1st Hypnotic Flair ( K Navarro 124 ) 2nd Sugar Ride ( H K Harkie 124 ) 3.00L 3rd Honey In The Bank ( J C Berrios 121 ) 3.50L 6th Change Order ( K J Coa 124 ) 6.00L See full results | K J Coa 56.2kg 6.00L | 6 (9) |
| Finger Lakes 09-Oct-25 1210m R5 Race 5 $1,370 (of $13,700) Barrier 5, Winning Time: 01:14.210, SP: 4.33 1st Je T'adore ( O Gomez 121 ) 2nd Emily Reward ( H K Harkie 124 ) 0.50L 3rd Change Order ( C J Navarro 124 ) 5.00L See full results | C J Navarro 56.2kg 5.00L | 3 (9) |
| Finger Lakes 25-Sep-25 1110m R7 Race 7 $2,740 (of $13,700) Barrier 7, Winning Time: 01:06.470, SP: 6.50 1st Our First Lady ( J Cruz 124 ) 2nd Change Order ( C J Navarro 124 ) 0.10L 3rd Cue The Music ( K J Coa 121 ) 2.60L See full results | C J Navarro 56.2kg 0.10L | 2 (7) |
| Finger Lakes 11-Sep-25 1210m R6 Race 6 $1,370 (of $13,700) Barrier 6, Winning Time: 01:15.470, SP: 4.50 1st Fauve ( L Pena 121 ) 2nd Positively ( Y Cintron 124 , Cd 131 ) 0.25L 3rd Change Order ( C J Navarro 124 ) 0.50L See full results | C J Navarro 56.2kg 0.50L | 3 (9) |
| Finger Lakes 28-Aug-25 1210m R7 Race 7 $350 (of $17,500) Barrier 7, Winning Time: 01:12.370, SP: 34.00 1st Open Soul Autism ( A S Worrie 124 ) 2nd Playing With Dolls ( L E Perez 124 ) 6.25L 3rd World Bank ( K J Coa 124 ) 7.25L 5th Change Order ( H K Harkie 124 ) 11.00L See full results | H K Harkie 56.2kg 11.00L | 5 (9) |
| Finger Lakes 19-Aug-25 1110m R8 Race 8 $351 (of $17,500) Barrier 2, Winning Time: 01:07.020, SP: 17.00 1st Cajunette ( K J Coa 124 ) 2nd Lady Banker ( K Navarro 124 ) 2.75L 3rd Valued Dreamer ( S Vives 120 ) 7.00L 5th Change Order ( H K Harkie 124 ) 8.75L See full results | H K Harkie 56.2kg 8.75L | 5 (7) |
| Finger Lakes 30-Jul-25 1210m FIRM R7 Race 7 $262 (of $17,500) Barrier 6, Winning Time: 01:13.720, SP: 15.00 1st Eastern Star ( J Flores 124 ) 2nd Zhen Lou ( E D Diego 124 ) 0.10L 3rd Miss American Pie ( K J Coa 120 ) 2.60L 7th Change Order ( H K Harkie 124 ) 13.45L See full results | H K Harkie 56.2kg 13.45L | 7 (7) |
| Finger Lakes 16-Jul-25 1110m FIRM R4 Race 4 $1,750 (of $17,500) Barrier 4, Winning Time: 01:06.800, SP: 21.00 Slmd foe st,rail bid 1st Practical Rachel ( K Navarro 124 ) 2nd Pesadilla Chanel ( C J Navarro 124 ) 0.10L 3rd Change Order ( H K Harkie 124 ) 0.60L See full results | H K Harkie 56.2kg 0.60L | 3 (8) |
| Finger Lakes 02-Jul-25 1610m GOOD R5 Race 5 (of $26,500) Barrier 9, Winning Time: 01:43.010, SP: 34.00 5w1/2,rail5/16,tired 1st Ekwanok ( K Navarro 124 ) 2nd Maize Loved Laffy ( H K Harkie 124 ) 1.25L 3rd Mia Nipotina ( J Cruz 124 ) 6.00L 9th Change Order ( A S Worrie 124 ) 23.10L See full results | A S Worrie 56.2kg 23.10L | 9 (9) |
| Finger Lakes 05-Jun-25 1110m FIRM R7 Race 7 $795 (of $26,500) Barrier 4, Winning Time: 01:06.210, SP: 26.00 4w3/8,2p1/4,no factor 1st Shaman Princess ( C Maragh 124 , Cd 131 ) 2nd Playing With Dolls ( J Cruz 124 ) 2.25L 3rd Outta The Cloud ( C J Navarro 124 ) 5.00L 5th Change Order ( A S Worrie 124 ) 5.35L See full results | A S Worrie 56.2kg 5.35L | 5 (5) |
| Finger Lakes 22-May-25 1110m FIRM R7 Race 7 $530 (of $26,500) Barrier 5, Winning Time: 01:07.960, SP: 21.00 6w1/2,5w trn,tired 1st Mambagigi ( A S Worrie 124 ) 2nd Bald Kitten ( K J Coa 120 ) 0.50L 3rd Echo Baybe ( E D Diego 124 ) 1.00L 6th Change Order ( C J Navarro 124 ) 11.75L See full results | C J Navarro 56.2kg 11.75L | 6 (6) |
| Finger Lakes 06-May-25 910m FIRM R4 Race 4 $1,855 (of $26,500) Barrier 3, Winning Time: 00:52.790, SP: 21.00 Rail trip,wth interest 1st Island Ride ( L E Perez 120 ) 2nd Hypnotic Flair ( K Navarro 124 ) 4.25L 3rd Call Me Penny ( R R Maragh 124 ) 4.30L 4th Change Order ( C J Navarro 124 ) 5.30L See full results | C J Navarro 56.2kg 5.30L | 4 (5) |
| Tampa Bay Downs 17-Mar-25 1310m FIRM R8 Race 8 $197 (of $21,000) Barrier 1, Winning Time: 01:17.900, SP: 26.00 moved out off the rail in the early going racing at the back, was never near enough to threaten. 1st Mo's Vino Mesa ( S Marin 118 ) 2nd Awesome Empress ( S Camacho 120 ) 0.25L 3rd Just Mercy ( M Iorio 118 ) 1.50L 7th Change Order ( A Rodriguez 118 ) 19.25L See full results | A Rodriguez 53.5kg 19.25L | 7 (7) |
| Tampa Bay Downs 01-Mar-25 1310m FIRM R3 Race 3 $200 (of $21,500) Barrier 4, Winning Time: 01:18.110, SP: 21.00 raced off the pace inside and was outrun. 1st Cant Fake The Hate ( C Oliveros 118 ) 2nd Fussy Girl ( S Camacho 120 ) 3.50L 3rd Ho Ho Ho Lets Go ( W Vasquez 118 ) 4.25L 7th Change Order ( A Rodriguez 118 ) 10.25L See full results | A Rodriguez 53.5kg 10.25L | 7 (7) |
| Tampa Bay Downs 15-Feb-25 1410m FIRM R1 Race 1 $1,260 (of $18,000) Barrier 6, Winning Time: 01:24.380, SP: 3.50 tracked on the inside, chased inside on the turn and closed mildly in the two path. 1st Thank The Academy ( S Marin 118 ) 2nd Captivating Sound ( H R D Jr 118 ) 0.50L 3rd Ghoz On ( U Casique 118 ) 4.25L 4th Change Order ( M Iorio 118 ) 4.75L See full results | M Iorio 53.5kg 4.75L | 4 (9) |
| Tampa Bay Downs 02-Feb-25 1210m FIRM R5 Race 5 $3,600 (of $18,000) Barrier 12, Winning Time: 01:11.610, SP: 5.50 was rated on the outside early, made a four wide move on the turn to be in contention by the quarter pole, made a bid leaving the turn and ran on to the wire but was outfinished by the winner in a good effort. 1st St. Joe Jet ( S Camacho 118 ) 2nd Change Order ( S Leon 118 ) 0.75L 3rd Keep In Touch ( M Iorio 118 ) 1.50L See full results | S Leon 53.5kg 0.75L | 2 (11) |
| Tampa Bay Downs 16-Jan-25 1410m FIRM R4 Race 4 $3,600 (of $18,000) Barrier 5, Winning Time: 01:25.140, SP: 5.50 2-3p,outkicked,2d best 1st Heavens Express ( S Marin 118 ) 2nd Change Order ( A Rodriguez 120 ) 0.50L 3rd Captivating Sound ( H R D Jr 118 ) 3.25L See full results | A Rodriguez 54.4kg 0.50L | 2 (10) |
| Tampa Bay Downs 02-Jan-25 1410m FIRM R4 Race 4 (of $18,000) Barrier 7, Winning Time: 01:25.440, SP: 4.50 chased the pace, raced in the four path on the turn and weakened. 1st Keep On Rockin ( S Marin 118 ) 2nd Oops Haha ( S Camacho 122 ) 1.25L 3rd Heavens Express ( S Hess 118 , Cd 125 ) 2.50L 8th Change Order ( A Gonzalez 120 ) 12.10L See full results | A Gonzalez 54.4kg 12.10L | 8 (8) |
| Tampa Bay Downs 14-Dec-24 1410m FIRM R8 Race 8 $1,800 (of $18,000) Barrier 12, Winning Time: 01:24.590, SP: 4.00 well placed and outside, looped to position three wide through the turn, bid on that path into the stretch, drifted in and lacked the needed late kick. 1st Deliziosa ( M Meneses 120 ) 2nd Keep On Rockin ( S Marin 120 ) 0.75L 3rd Change Order ( A Gonzalez 120 ) 1.00L See full results | A Gonzalez 54.4kg 1.00L | 3 (11) |
| Tampa Bay Downs 28-Nov-24 1210m FIRM R1 Md $10,710 (of $17,001) Barrier 1, Winning Time: 01:10.790, SP: 17.00 set the pace just off the rail, stayed on when challenged into the stretch, shook clear, then lasted under steady pressure. 1st Change Order ( A Gonzalez 122 ) 2nd Oops Haha ( S Marin 122 ) 0.50L 3rd Play Maker ( D E Gonzalez 122 , Cd 132 ) 4.50L See full results | A Gonzalez 55.3kg | 1 (7) |
| Philadelphia Park 23-Oct-24 1310m FIRM Md (of $15,960), Winning Time: 01:20.840, SP: 6/1 Chased 3w turn, tired 1st Chance Occurrence ( W Vasquez 125 ) 2nd Spanish Girl ( E Ruiz 122 ) 0.15L 3rd Norho's Gamble ( A Crispin 122 ) 0.15L 4th Change Order ( L Rivera 122 ) 0.15L | L Rivera 55.3kg 0.15L | 4 (8) |
| Philadelphia Park 25-Sep-24 1210m FIRM Md (of $13,200), Winning Time: 01:12.680, SP: 18/1 Never in contention 1st Bearly Working ( R Silvera 122 ) 2nd Bossy Kate ( D Haddock 122 ) 0.15L 7th Change Order ( J Torres 122 ) 0.15L | J Torres 55.3kg 0.15L | 7 (8) |
| Colonial Downs 05-Sep-24 1610m GOOD R11 Md (of $27,999) Barrier 12, Winning Time: 01:36.910 tracked the pace from two wide in the second flight, rallied on the final turn to loom up and weakened in the stretch. 1st Streetcorner ( B Curtis 118 ) 2nd Valley Star ( R Silvera 118 ) 0.25L 3rd Tins ( J Ruiz 118 ) 1.50L 6th Change Order ( T Conner 118 ) 6.60L See full results | T Conner 53.5kg 6.60L | 6 (11) |
| Colonial Downs 25-Aug-24 1710m GOOD R2 Md (of $45,000) Barrier 3, Winning Time: 01:43.500 was not a factor. 1st Champlain's Dream ( V R Carrasco 124 ) 2nd Baywatch Blonde ( J Ruiz 118 ) 0.25L 3rd Channel Loop ( M J Sanchez 118 ) 0.50L 6th Change Order ( I Villalobos 118 ) 5.75L See full results | I Villalobos 53.5kg 5.75L | 6 (7) |
| Colonial Downs 27-Jul-24 1610m GOOD R1 Md (of $35,000) Barrier 6, Winning Time: 01:39.570 in tight at the start, settled in mid pack, in some traffic into the far turn, came up empty for the stretch run. 1st Lady Ophelia ( B Curtis 118 ) 2nd Independence Way ( M J Sanchez 118 ) 0.50L 3rd Ain't No Lady ( T Mccarthy 118 ) 2.25L 7th Change Order ( R Silvera 118 ) 7.50L See full results | R Silvera 53.5kg 7.50L | 7 (10) |
| Aqueduct 04-Dec-23 1310m FIRM R9 Md (of $36,000) Barrier 2, Winning Time: 01:19.670 was hustled from the gate, chased the pace, dropped back late on the backstretch, moved from the two path to the four path on the turn, floated six wide into the stretch and had nothing left. 1st Pretty Up ( K Carmouche 119 ) 2nd Needed ( J Castellano 119 ) 0.25L 3rd Mia Nipotina ( E Cancel 119 ) 3.25L 7th Change Order ( R Silvera 119 ) 8.35L See full results | R Silvera 54kg 8.35L | 7 (12) |
| Aqueduct 10-Nov-23 1210m FIRM R9 Md $2,520 (of $36,000) Barrier 10, Winning Time: 01:11.690 was away awkwardly, raced on the outside under urging, dropped back four wide on the turn and tired. 1st Tavin ( M Franco 119 ) 2nd Speights Dance ( L J Luzzi 119 ) 1.25L 3rd Cromarty ( E Ruiz 119 , Cd 114 ) 9.50L 4th Change Order ( L R R Jr 119 , Cd 124 ) 15.75L See full results | L R R Jr 54kg, Cd 56.2kg 15.75L | 4 (7) |